If you have driven by our location on SE 27th St lately, you’ve seen the slow transformation of the building! The old metal siding had fallen victim to drainage issues caused by installation of asphalt at a higher level than the siding (before Kalix purchased the building).  The result is water problems and the need to replace the siding.  Insulation also needed to be replaced.

 Painting on the front section is done – new colors look great.  Note evidence of work in progress on the upper level.

Painting on the front section is done – new colors look great.  Note evidence of work in progress on the upper level.

  A close-up shot shows the condition of the old metal siding on the left.  Note the height of the asphalt.  The new siding is visible on the right edge of the photo

A close-up shot shows the condition of the old metal siding on the left. Note the height of the asphalt. The new siding is visible on the right edge of the photo

 

 

Mattson’s Construction at work, one section at a time, offers an interesting view into the building.